
Appointments for PSL inspections are available Monday through Friday, except on EBMUD holidays.
EBMUD will witness an air or water verification test. The test should be conducted per the guidelines below and is usually done by a qualified contractor. See pages 4-6 of the guidelines for test set-up examples. The test should be ready and under pressure at the start of the appointment window. Due to the number of inspections performed, the inspector will not have time to wait if the test is not ready when he or she arrives.
Please note that if more than one verification test is being conducted, call the scheduling desk for a special appointment.
Please be ready at the start of the window. EBMUD will conduct the inspection within the scheduled window.
PSL Contractor Guidelines
| Document | Type | Size |
|---|---|---|
| PSL Contractor Guidelines | <1 MB | |
| PSL Contractor Guidelines Chinese | <1 MB | |
| PSL Contractor Guidelines Mam | <1 MB | |
| PSL Contractor Guidelines Spanish | <1 MB | |
| PSL Contractor Guidelines Vietnamese | <1 MB | |
| FAQ For Contractors | <1 MB | |
| Contractor Guidelines For Main And Manhole Testing | <1 MB |
Additional Resources
| Document | Type | Size |
|---|---|---|
| Inspection Fee Guidelines | <1 MB | |
| Construction Remodel Guidelines | <1 MB | |
| Extended Foundation Guidelines | 1.2 MB | |
| Port Of Oakland PSL Form | <1 MB | |
| Alameda Point PSL Form | <1 MB |