Skip to main content

Compliance Certificate

A Compliance Certificate is issued when a Private Sewer Lateral (PSL) is verified to be leak-free. Your property needs a Compliance Certificate when meeting one of the following three triggers:

Reason Trigger
Buying or selling property Required to close escrow
Building or remodeling in excess of $100,000 Final permit sign-off
Changing water meter size Changing water meter size

You can always voluntarily obtain a Compliance Certificate without meeting any of the above triggers.

 Check Compliance Status

How to obtain a Compliance Certificate:

  1. Check your property's compliance status.
  2. Hire a contractor to assess your PSL and perform repairs or replace it, if necessary. See guidelines for detailed information on the certification process.
  3. Schedule an EBMUD inspection to verify that your PSL is leak-free.
  4. A Compliance Certificate will be issued once the PSL passes the EBMUD witnessed inspection.

You can check compliance status, schedule an inspection, apply for an exemption, and more using EBMUD’s PSL Program portal.

How long Compliance Certificates remain valid:

7-years

  • The lateral is not in need of repair, or is repaired if work is needed. The lateral is not completely replaced. The inspection confirms the lateral is free of leaks.

20-years

  • The lateral is completely replaced. The inspection confirms the lateral is free of leaks.

Where does the ordinance apply?

Map of EBMUD Wastewater Service Area
The regional PSL ordinance is in effect in the following cities:

  • Alameda
  • Albany
  • El Cerrito
  • Emeryville
  • Kensington
  • Oakland
  • Piedmont
  • Richmond Annex

 

City of Berkeley:

The city of Berkeley operates its own separate program. If your property is in Berkeley, please contact them to  determine your requirements.

http://www.cityofberkeley.info/psl/