Revised Study Plan
On July 30, 2026, EBMUD filed its Revised Study Plan (RSP) with FERC, in accordance with the requirements of Title 18 of the U.S. Code of Federal Regulations (CFR) Section 5.13. The RSP is also available on the FERC eLibrary.
Study Plan Determination
FERC issued its Study Plan Determination (SPD) for the Lower Mokelumne River Hydroelectric Project (P-2916) on September 21, 2026. The SPD is also available on the FERC eLibrary.