Our storm preparation starts long before rain appears in the forecast. On blue-sky days, we prepare and train employees, maintain equipment, and inspect facilities and infrastructure across our water and wastewater systems.

During storms, we closely monitor forecasts and conditions, adjust operations and coordinate with partner agencies. Crews are available around the clock to respond.

El Niño can increase the likelihood of a wetter California winter, but it does not guarantee major storms or flooding in the Bay Area. We prepare every year, regardless of the outlook.

  • We carefully manage reservoir levels to accommodate incoming runoff while protecting water supplies. Staff inspect dams, monitor their condition and maintain emergency response plans.
  • EBMUD staff regularly monitor dams using instruments, conduct monthly visual inspections and perform periodic dam safety reviews. In addition, state and federal dam safety regulatory agencies oversee this work and perform their own independent annual dam inspections. 
  • EBMUD performs comprehensive assessments of its dam spillways to confirm their condition and continues to follow up with regular maintenance and improvements to ensure adequate performance for each upcoming rainy season.
  • Our upcountry reservoirs, Pardee and Camanche, work together to balance water supply, flood control and downstream flow requirements. Federal rules require up to 200,000 acre-feet of flood-control space during the wet season.
  • We coordinate forecasts and planned releases with the U.S. Army Corps of Engineers, PG&E and downstream agencies, and notify downstream stakeholders about releases.
  • We lower East Bay reservoir levels as needed before the rainy season and reduce or pause planned releases around significant storms to minimize flow in downstream creeks.
  • At all critical facilities, crews inspect systems, address hazards and test backup generators to ensure reliability. 
  • Dam seismic evaluations have been completed for all 5 local water supply reservoirs, and any necessary upgrades are complete or underway, including construction at Lafayette Reservoir.
  • Heavy rain can wash sediment and organic material into reservoirs, making water harder to treat.
  • Staff monitor water quality and system conditions and make the necessary adjustments at treatment plants and in the distribution system to provide a safe and reliable water supply.
  • EBMUD operates the regional wastewater treatment system (Main Wastewater Treatment Plant, interceptor pipes, pump stations, and wet weather facilities). Local cities own and operate the sewer collection system that carry wastewater from homes and businesses to EBMUD’s regional system.
  • Our community’s sewers and storm drains are separate systems. But rainwater and groundwater can enter sewers through cracked public sewer mains and damaged private sewer pipes. That extra water can increase wastewater flows tenfold or more—from about 50 million gallons a day in dry weather to 500 million gallons a day or more during storms. 
  • Those extreme flows can overwhelm pipes and treatment facilities, increasing the risk of sewage backups and impacts to Bay water quality.
  • We prepare months ahead through thousands of maintenance hours, operator training and equipment checks. Staff monitor forecasts up to two weeks ahead and adjust staffing as storms approach.
  • Our main treatment plant operates 24/7. During major storms, we activate three additional wet weather facilities as needed to manage and treat excess flows.
  • We have 17 million gallons of wet weather storage across the main plant and wet weather facilities.
  • When flows exceed the main plant’s full treatment capacity, we use blending, which combines primary-treated and secondary-treated wastewater. These operations help reduce overflow and backup risks, following established procedures and regulatory requirements.
  • We have added backup cellular connections at 14 monitoring stations and 12 pump stations to improve monitoring.
  • About $1.2 billion in capital improvements is planned at the main treatment plant, within the interceptors, at remote pump stations and at the three wet weather facilities over the next decade.
  • We also work with local municipalities and property owners to repair or replace aging pipes, which reduces the amount of stormwater entering sewers. Managing storm flows takes a sustained regional effort.
  • Sign up for county emergency alerts and EBMUD water emergency notifications, and follow public advisories during storms.
  • For water service emergencies, call EBMUD’s 24-hour line at 1-866-403-2683. Visit ebmud.com/alerts for current water outages.
  • Make sure stormwater from your property is routed to the storm drains and have your private sewer lateral checked for leaks. To learn more about private sewer lateral certification, visit ebmud.com/psl.
  • If you experience a sewage backup or see sewage overflowing from a maintenance hole, contact your city.