What is the volume of material to be hauled?

Under the soil treatment option, up to 10,000 cubic yards of material (soil and solidified mixture of cement and soil) would be temporarily stockpiled on the dam stream face of the dam. The soil treatment alternative would require the import of 5000 tons of cement, which uses heavier cement trucks.