How will street pavement be restored?

EBMUD will do a T-cut repair, which means a replacement of the roadway to one foot beyond the edge of trench. Where the edge of the trench is within 2 feet of a gutter lip or the edge of pavement, the pavement between the trench cut and the gutter lip or edge of pavement will be removed and replaced. The permanent replacement paving will be installed towards the end of the project, so initially residents will see temporary asphalt in the trench area.