Santa Fe Avenue Pipeline Replacement

pipeline-construction-activities.jpgBeginning June 2018, EBMUD crews will be installing a new water pipeline to improve water service in your neighborhood. We will be working on Santa Fe Avenue from Solano Avenue to Gilman Street in Albany. We expect to complete pipeline installation by January 2019, with final paving to follow.

What to expect during construction

Equipment and materials will be temporarily located in your neighborhood during construction. After installation of the new water pipeline, crews will transfer water services, install fire hydrants and make final connections. Once construction is completed, material and equipment will be removed within 1 to 2 weeks.

Schedule

Work hours are 7 a.m. to 4:30 p.m., Monday through Friday. We will provide traffic control, but residents may experience delays up to ten minutes when entering and leaving the work area.

If you have special needs, please call us and we will make every effort to accommodate you.

Water service interruption 

Crews will notify you, in person or with a door hanger, regarding any planned water service interruption to your property. After a service interruption, there may be air in the pipes that may loosen particles in your home plumbing. Close your toilet water supply valves, and then run water from your front hose bib, bathtub and/or cold water faucets for 1-3 minutes. This will dispel any air or loosened particles from your household pipes. If any water quality issues remain after flushing, please call us.

Paving and street surface 

The asphalt paving applied daily is temporary and designed to provide a safe road surface during construction. Final paving will occur after pipeline work is completed. It may take up to 30 days or longer before final paving is complete.

Contact

Sharla Sullivan, Community Affairs Representative
Email: sharla.sullivan@ebmud.com
Phone: 510-287-7208 or call the Pipeline Construction Division at 510-287-0882 (Monday-Friday, 7 a.m. to 3:30 p.m.)