San Pablo Reservoir HOS Project

East Bay Municipal Utility District (District) intends to award a contract with duration of up to 36 months to the most qualified consultant (proposer) who best meets the District’s requirements for the design of a hypolimnetic oxygenation system (HOS) at San Pablo Reservoir. The consultant must have experience and qualifications in selection, design, constructability, start-up, and testing of HOS for lakes and reservoirs.

This scope of this project is to prepare the design drawings, construction contract documents, and engineering support services during construction to construct a HOS at San Pablo Reservoir, El Sobrante, CA.

Please respond to this Request for Proposal no later than 4 p.m. on Wednesday, July 18, 2018. Proposals should be mailed or delivered to: 

Mail: Hand Delivered/Fed Ex:

EBMUD
ATTN: Andrew Akelman, Manager of Purchasing
RE: RFP for San Pablo Reservoir HOS Project – RFP No. 557-18-02
Purchasing Division
P.O. Box 24055, MS 102
Oakland, CA 94623-1055

EBMUD
ATTN: Andrew Akelman, Manager of Purchasing
RE: RFP for San Pablo Reservoir HOS Project – RFP No. 557-18-02
Purchasing Division
375 Eleventh Street, First Floor
Oakland, CA 94607-4240

Questions 

If you have questions regarding this RFP, please contact Ali Sheikholeslami, Associate Civil Engineer, at ali.sheikholeslami@ebmud.com or 510-287-2047.